layiq
worthy; deserving; fitting; suitable.
A role, opportunity, or path that merits attention, time, and pursuit.
Loading LAYIQ…Job opportunity
Shaw Industries Group
Shaw Plant 4, 2225 S Hamilton Street Extension, Dalton, GA 30721 USA
Source: Shaw Industries Group careers · View original posting
From Shaw Industries Group's posting. “We” and “our” refer to the employer.
Job Title
Finishing Inspector Lead| Monday - Friday
Position Overview
This position is Monday - Friday 3pm-11pm.
The Lead Inspector plays a critical role in supporting quality operations across two continuous finishing lines. This position is responsible for assisting with carpet inspection, making decisions on carpet grading, and guiding inspection team members to ensure consistent quality standards. The Lead Inspector will move between lines as needed to provide real-time support, resolve grading concerns, and help identify off-quality issues.
1. Lead Inspector o Make informed grading decisions based on established quality standards.
o Assist inspectors on both lines with difficult calls or uncertain grading situations.
o Provide on-the-spot training and feedback to support consistent inspection and grading practices.
o Communicate with quality, supervisors, operators, and other team members to ensure proper handling of product.
o Document inspection findings and assist in tracking trends or recurring quality issues.
o Ensure all Flashbacks are submitted, and photos are communicated of carpet downgraded on the line.
o Support continuous improvement efforts by identifying and reporting issues that may affect product quality.
o Serve as a liaison between inspectors and supervisors when grading discrepancies arise.
o Serve as a liaison between inspectors and supervisors when grading discrepancies arise.
2. Routine Inspection
A. Constantly observe carpet on inspection table for any defects including tufting, yarn, backing defects.
1. Yarn defects a) Yarn problems usually appear in the form of a single end streak.
b) These types of problems create either straight or shifted streaks depending on the tuft pattern.
c) If a yarn problem is found, one roll(s) will be held for review if the defect is 75 feet or more. If the defect is less than 75 feet, the carpet will be downgraded according to the grading system and a representative cut made for yarn technical evaluation. This cut should be 9”x9”.
d) At this point, perform the streak evaluation (scale 1-10).
(1) 1-4 represents the worst possible case (heavy streaking)
(2) 5 represents marginal goods
(3) 6-10 represents grade “A”- some light streaking, but still first quality e) Carpet rated 5 or higher is acceptable for shipment, assuming there are no other defects.
f) Any carpet rated lower than 5 will be as follows:
b) Other problems resulting from the dyeing processes include wrinkles, dye spots, dye smears, and any others listed on the defects code sheet. It is the inspector’s responsibility to know and recognize these defects.
c) Any carpet with dye problems should be held if the defect will cause a short first or off quality.
3. Coating defects a) Defects caused by coating are listed on the defect code sheet. It is the inspector’s responsibility to know and recognize these defects.
b) The inspector clerk should be informed of any coating defects in order to make note on the roll ticket.
c) Rolls should be held for repair when a repair is possible.
d) If the defect cannot be repaired (latex on face, holes, etc), the carpet should be downgraded according to the system or the defects cut out.
B. Assign proper hold code for defects noticed.
C. Communicate issues to supervisor and responsible party in a timely manner.
D. Escalate any off quality downgraded that is over 100 ft.
E. Mark area affected by defect with tape if possible.
F. Check each seam to cut out all loose secondary backing while minimizing scrap waste.
G. Check secondary backing periodically and report any defects in the backing itself or its application. Report issues to supervisor.
H. Check carpet for moisture or any other defects. If any defects are observed complete the flashback Google Doc and consult supervisor.
3. Performing the Width Check
A. The width of the carpet should be monitored constantly via the digital readout.
B. On each MO, lay the tape measure across the width of the carpet and note the resulting measurement. Notify supervisor if digital readout is more than ¼“ difference.
C. Width limitations on carpet grade are as follows:
LAYIQ is an independent job-discovery service. This listing does not imply a partnership with or endorsement by the employer. Review the original posting for current details and availability.
Employer posted: