layiq
worthy; deserving; fitting; suitable.
A role, opportunity, or path that merits attention, time, and pursuit.
Loading LAYIQ…Job opportunity
Brownsville, Texas, United States
Source: Saronic Technologies careers · View original posting
From Saronic Technologies's posting. “We” and “our” refer to the employer.
Saronic Technologies is a leader in revolutionizing autonomy at sea, dedicated to developing state-of-the-art solutions that enhance maritime operations through autonomous and intelligent platforms.
Job Overview
The Manufacturing Engineer – Propulsion & Machinery Installation Planning defines the complex, high-precision installation steps and processes used to install, align, and commission main propulsion equipment, reduction gears, shafting, bearings, and associated drive train components aboard autonomous surface vessels. This role also plans installation of other critical ship's machinery systems, including anchor handling systems, ramp installation, and ramp lowering/actuation systems specific to LCU-type vessel programs.
This role translates design intent and manufacturer requirements into sequenced, repeatable installation processes that production teams can execute precisely and safely.
Propulsion and machinery installation carries far less tolerance for error than general outfitting. A shaft line that is out of alignment, a foundation that is not set correctly, or a ramp and anchor system that is not installed and tested to specification, can cause vibration, equipment failure, or a mission-critical system failure once the vessel is underway or beaching.
This role ensures installation sequence, alignment procedures, and inspection hold points are defined correctly and executed with discipline across all of these machinery systems.
This role works closely with structural, electrical, piping, and HVAC planning teams, quality assurance, and equipment manufacturer technical representatives to ensure propulsion and other ship's machinery installation happens at the correct stage of construction.
● Propulsion and machinery installations meet alignment and tolerance requirements on the first attempt.
● Anchor handling and ramp lowering systems are installed and function correctly on the first functional test.
● Shaft line alignment remains valid through launch, dock trials, and sea trials.
● Installation sequence avoids rework from hull deflection or premature installation.
● Inspection hold points catch issues before they compound into equipment damage.
● Production, quality, and vendor representatives trust the installation plan as an accurate reference across all machinery systems.
LAYIQ is an independent job-discovery service. This listing does not imply a partnership with or endorsement by the employer. Review the original posting for current details and availability.
Employer posted:
Saronic Technologies · Brownsville, Texas, United States; Austin, Texas, United States
Saronic Technologies · Brownsville, Texas, United States
Saronic Technologies · Brownsville, Texas, United States; Austin, Texas, United States
Lowe's · Brownsville, TX 2669
Westlake · US - Brownsville, TN; LASCO - Brownsville
Westlake · US - Brownsville, TN; LASCO - Brownsville